Earlier this year I wrote a post about how I was far from happy with the new logo and its placement on Holloway Odeon, my local cinema, a building which has been undergoing renovations this past year or so.
On Thursday I was walking up Holloway Road and, as I turned into Tufnell Park Road, I looked up and and exclaimed "Wow" out loud as I saw the gleaming façade finally revealed.
A man heard me and stopped and stared at me, grinning. I thought that he thought the 'wow' was directed at him, but no. I spoke to him and he introduced himself as David Latter, the architect of the building. I wondered if Howard Crane the actual architect of the building back in 1938 would have been pleased to hear someone taking the credit, but nevertheless engaged David in conversation and we chatted about the renovation which he was clearly very pleased about. I commended him on the removal of the blue paint on the metal windows which have been stripped and painted black and the reinstatement of the restaurant area there. I made mention of my knowledge of the history of the building and I also made comment about those nasty logo panels, but it was clear from his expression he didn't really get my point. He told me his company works on lots of revamped cinemas round the country and he gave me his business card. I also briefly met his assistant who was unchaining his bike from a nearby lamp post. David urged me to go inside to view the interior.
I crossed the road to take a closer look. I couldn't get inside as it's not yet open to the public, but the interior does indeed look better designed. That can wait for another day. Instead I wandered around the outside at studied the renovation at street level.
Oh dear, what a disappointment.
From a distance it looks marvellous, but get up close and it's slapdash, shoddy workmanship. I cannnot believe with all the products and processes available today that better results cannot have been achieved. Most of the lovely original faience tiles have been painted. I think on the upper sections shown above that a layer of varnish has been added as no way way was it ever that shiny before. However, other areas at ground level have been overpainted in a strange yellow tone that is not the same as the pale terracotta originals that have stood the test of time for over 80 years. That might have been Ok had the paintwork not been so messy – wires have been painted over without any idea of realigning them, edges are not straight, there are patches of overpainting, holes and defects have not been repaired. Yet the original tiles are still filthy, hinting that this new paint has been applied over years of dirt. New additions such as the canopy are mis-aligned and far from curved with cut and breaks and gaps where they bend and abut other areas.
Basically, if they could achieve an impressive, or even just adequate, standard of workmanship in the 1930s, why is it not possible today? Quality control or pride in one's work does not seem to be important these days.
See the evidence below.
On Thursday I was walking up Holloway Road and, as I turned into Tufnell Park Road, I looked up and and exclaimed "Wow" out loud as I saw the gleaming façade finally revealed.
Holloway Odeon, 2020 renovation, main tower and entrance on the Tufnell Park Road side |
I crossed the road to take a closer look. I couldn't get inside as it's not yet open to the public, but the interior does indeed look better designed. That can wait for another day. Instead I wandered around the outside at studied the renovation at street level.
Oh dear, what a disappointment.
From a distance it looks marvellous, but get up close and it's slapdash, shoddy workmanship. I cannnot believe with all the products and processes available today that better results cannot have been achieved. Most of the lovely original faience tiles have been painted. I think on the upper sections shown above that a layer of varnish has been added as no way way was it ever that shiny before. However, other areas at ground level have been overpainted in a strange yellow tone that is not the same as the pale terracotta originals that have stood the test of time for over 80 years. That might have been Ok had the paintwork not been so messy – wires have been painted over without any idea of realigning them, edges are not straight, there are patches of overpainting, holes and defects have not been repaired. Yet the original tiles are still filthy, hinting that this new paint has been applied over years of dirt. New additions such as the canopy are mis-aligned and far from curved with cut and breaks and gaps where they bend and abut other areas.
Basically, if they could achieve an impressive, or even just adequate, standard of workmanship in the 1930s, why is it not possible today? Quality control or pride in one's work does not seem to be important these days.
See the evidence below.
The new window frames look marvellous but the black-edged canopy above street level has frilled edges |
More views of the canopy along the Tufnell park Road side – juddery curves and wobbly straights |